Re -Fit Bathroom - It will be stripped to bones except the toilet will remain and the existing basin services. (Relocation of water articulation for shower) Water / Moist barriers and installing the Shower with pan and drainage, finalise it with tiling floor and walls to the top. Plan to do during second week of December 2022. Tiles will be provided. Shower and accessories will be provided.
#1 | Tradie 1 |
|
0 jobs | No longer in contact |
#2 | Tradie 2 |
|
17 jobs | No longer in contact |
Partner with Builderscrack
Get work