Plumbing for new wall hung vanity. Hot water copper/steel pipe will need a couple elbows, approx 1m straight piping and a new threaded connection for the tap to screw onto. Cold water should be fine as is. Waste will need the P trap connected and maybe small adjustment to rough plumbing. Mostly labour's only, most materials on site.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Brad was vey professional and efficient. A great experience.
Work carried out by the owner/operator
Reviewed on 12-01-2023
Partner with Builderscrack
Get work