I need this job done ASAP so that the new floorboard and gib can be installed. This Monday 25 March would be great! Or ASAP next week. I cannot move on with the rest of the work until this is done... I am available all day from 8:30 am till 7pm or 8 pm (or even later if need be) The relocation will require about 3 metres of 15 mm pipes (X 2), about 2 metres of 40 mm waste pipe, a shower control. The house was built in 1925
#1 | Tradie 1 |
|
18 jobs | No longer in contact |
#2 | Tradie 2 |
|
86 jobs | No longer in contact |
Partner with Builderscrack
Get work