Closed job

Replace underground pipe

Job image
Job image
Job image

Job description

Drainlaying
Wellington

I want to get a section of pipe replaced. The current pipe (original clay pipe I think) is 400mm deep and runs straight through where some new piles will go (also 400mm deep). The replacement pipe needs to go around the outside of those piles, rather than through them like now! Pictures: (1) The first picture shows the holes where the two piles should go, and the distance between them - 2.3m. (2) The second picture is the left hole - you can see the pipe running along the bottom. (3) The third picture is the other hole - again, the pipe is visible. This picture also shows that there is a junction from where another pipe, coming from inside the house, joins on to the first one. So in total I think in total the existing pipe would need cut in three places (left of the first hole, right of the second hole, and just before the junction).


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo