Removing old HWC and installing new 180L cyclinder 1m to the left of existing location, removing bath and installing new shower tray. New cyclinder and shower tray to be supplied by owner.
#1 | Tradie 1 |
|
65 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 18 jobs | No longer in contact |
Partner with Builderscrack
Get work