Active job

Installing channel drains and connecting them to an existing out flow

Job image

Job description

Drainlaying
Waitakere

I hope the image gives a rough idea of what I'm after. There are two main sections of channel drains to be installed. Unsure how these are connected, and even if what I'm proposing is optimal. Open to hear suggestions, obviously this would need to connect with existing stormwater pipes.


Trade professionals

#1 Tradie 1
14 jobs No longer in contact
#2 Tradie 2
128 jobs No longer in contact
#3 Tradie 3
241 jobs No longer in contact
#4 Tradie 4
58 jobs No longer in contact
#5 Tradie 5
1 job No longer in contact
#6 Tradie 6
0 jobs No longer in contact
#7 Tradie 7
1 job No longer in contact
#8 Tradie 8
51 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo