Disconnect kitchen sink, laundry tub taps & washing machine taps & cut out waste. Redirect pipework & install new waste for kitchen sink & washing machine. Kitchen sink now moving to under window, new dishwasher will hook into same waste. Laundry tub NOT being replaced, washing machine will sit facing out towards the kitchen (wall is being removed with fire extinguisher on it). I will supply new Methven single lever sink tap & Methven Awa wall mount washing machine taps. Plenty of room under the unit where pipework is currently. Disconnect & new pipework needs to be done on Mon 29th OR Tues 30th June. Final fix will likely be around the 20th July. Dishwasher does not need to be connected as I will get that at a later stage.