Kitchen Reno. 2 trips Aug 29 Will first need the pipes to the taps capped, ideally just a couple shut off valves for hot and cold while we demo. Sep 2 2nd will be install for new taps and drain (drain shouldn't have to move much) Also drain required for new dishwasher. Cheers
#1 | Tradie 1 |
|
100 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 31 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 8 jobs | No longer in contact |
Partner with Builderscrack
Get work