Review

Change toilet suite

Job image

Job description

Toilets
Glen Eden, Waitakere

Published on 25 March 2025

remove old model current toilet bowl and flush tank and replace with back to the wall toilet suite with necessary water connections.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Jaeze arrived on time, was very professional, gave me a variety of suitable options and did an excellent job while keeping me informed. I would highly recommend contacting him for all your plumbing needs.

Work carried out by the owner/operator
Reviewed on 28 March 2025

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo