Install new bore pump , trench and lay cable and pipe from the bore to tank. Backfilled trenches. Plumbed to tank.
#1 | Tradie 1 |
|
18 jobs | No longer in contact |
#2 | Tradie 2 |
|
17 jobs | No longer in contact |
Partner with Builderscrack
Get work