Needing two downpipes and connected to the boundary. See attached image. Distance from back to boundary is 20m roughly There is already a curb outlet and pipe under the footpath to our boundary. I'm happy to trench and do downpipes if I can get the underground work done by you, or all by you if you prefer. May require a bubbleup. Aiming to have job completed by 1 Oct or very soon after.
#1 | Tradie 1 | No recent reviews | 8 jobs | No longer in contact |
Partner with Builderscrack
Get work