Drainlaying
Waikato

Tank Pad needs to be built up ,land is sloped with fall on one edge ,I have clay and soil on site just needs moving ,tank install along with piping to existing tank and about 20 meters of underground pipe work (90 mm down pipe has been used on shed)from garage to new tank (new tank will need to be purchased within quote) time frame within 6 months


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Great company to deal with and the final result was better then excepted . Thanks a lot teams

Work carried out by an employee of the company
Reviewed on 16-05-2019

Tradesperson reply
"Thank you for the kind review. We are pleased the job went well :)."

Verified Builderscrack review