I am having a house relocated onto the back section of my existing property. The house is moving approx 15 metres backyards, the house is being moved in 2 weeks time. I require a new sewer and water pipe to be layed from the front boundary to the newly located position - approx 20-35 metres in total. I want the plumbing reconnected once the house is repositioned, with new soak holes etc. The work will require a new trench that is sufficient to run new power/ph cables to be run. If you work with an electrician or can recommend an electrician to complete the work at the same time would be great. I can email plans of the work required, or I am very flexible with coming onsite to visit and discuss. Any queries please ask. Cheers
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very pleased with the work, very quick & professional, would recommend to anyone.
Work carried out by the owner/operator
Reviewed on 21-02-2011
#1 | Tradie 1 | No recent reviews | 5 jobs | Secured job |
Partner with Builderscrack
Get work