We have some plumbing work that we would like completed as soon as possible. In picture 1 (with the bath) we are shifting the plumbing to the opposite side and doing a shower over the bath so will need to keep the taps and add a mixer. In picture 2 we are installing a new toilet. In picture 3 we are shifting the vanity to the left and will need the plumbing moved over as well. In the last picture this is the shower unit that we are getting rid of, so will need the plumbing there removed.
#1 | Tradie 1 | No recent reviews | 8 jobs | No longer in contact |
#2 | Tradie 2 |
|
10 jobs | No longer in contact |
#3 | Tradie 3 |
|
15 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 7 jobs | No longer in contact |
Partner with Builderscrack
Get work