Will be needing a drainlayer for relocated house arriving soon on small section. As soon as section has been leveled for the house site, we can start the drainlaying, before the house arrives. So job would be ready to do in between 4-6 weeks. Thanks.
#1 | Tradie 1 |
|
36 jobs | No longer in contact |
#2 | Tradie 2 |
|
138 jobs | No longer in contact |
Partner with Builderscrack
Get work