To install approx 50 meters of sewer line and connect to septic tank, toliet and gully trap Trench is already dug and pipe and fittings is supplied by previous drain layer.
#1 | Tradie 1 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work