Active job

Run outdoor waste pipe and connect to existing waste

Job image
Job image
Job image
Job image
Job image

Job description

Drainlaying
Rodney

We are adding a toilet and new waste, and we need a certified drain layer to lay a waste pipe outside of the home and connect it to the existing waste, according to the council's consent-approved map. Approximate length 11 m, including 2 meters of outdoor parking concrete cutting. A screenshot of the approved design and location is attached. Call me for any more details.


Trade professionals

#1 Tradie 1
31 jobs No longer in contact
#2 Tradie 2
12 jobs No longer in contact
#3 Tradie 3
5 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo