Cut through concrete at point marked on our deck, dig down to existing sewer pipe (believe about 500mm below deck) and replace a half meter section that has a failed joint due to subsidence. Would require circa 500mm of 100mm pipe and two plumbquicks. Backfill, and happy to receive quotes with or without reinstatement of the concrete deck. We need job completed asap as water is now leaking into a lower bedroom next to this joint. Have included photos of a nearby gully trap and inspection point as an FYI.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great guys who did a fantastic job. I'm very happy with the process and outcome.
Work carried out by the owner/operator
Reviewed on 21-02-2017
Tradesperson reply
"Thanks for the great feedback mate, glad we could help"