Active job

Drainlaying- Remove existing Septic outlet and connect to manhole on site- 60mtr

Job description

Drainlaying
Porirua

As described above we have the plans to connect a new lateral connection to an existing manhole that is on-site. Require the help of a licensed drainlayer to lay 100 mm piping and a lateral for future connection of a new home. The manhole is located 60m downhill.


Trade professionals

#1 Tradie 1
17 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo