Review

new ensuite

Job description

Renovation & Repair
Papakura

To relocate vanity pipes to a different place. To put in piping for a new shower. We have the shower,mixer, showerhead and waste, and vanity, tap mixer and sink hole. All that is required is the underfloor and wall piping, and labour to do so. Materials Required: Buteline Pipe 15mmx5m x 4 Adaptor PB Male Brass M15B 1/2INx15mm Buteline x 4 Buteline Bracket Elbow 1/2x15mm x 3 Adaptor PB Swivel FEM F15 1/2INx15mm Buteline x 3 Bend F+F SCJ DWV --- x 6 40mm PVC SWV Optim SJ Pipe 6m Length --- SOE x 1 Tube Nippling Screwed Brass BSST 15mmx600mm x 0.5 Aqua FH300 SS Flexi Hose 15x300mm x 1 ***These have been taken by another Plumber - so do not know if it is fully correct.


Review

Workmanship
5.0
Cost
4.0
Schedule
5.0
Communications
5.0

Thank you Jeremy & Dee, your contact and explanations to our questions were second to none. Great Job.

Work carried out by the owner/operator
Reviewed on 19-12-2011

Tradesperson reply
"Great people to work with and job straightforward. Many thanks."

Verified Builderscrack review

Trade professionals

#1 Tradie 1 No recent reviews 4 jobs Secured job
#2 Tradie 2 No recent reviews 47 jobs No longer in contact
#3 Tradie 3
559 jobs No longer in contact
#4 Tradie 4 No recent reviews 31 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo