I need a clay downpipe from the toilet replaced. I have replacement pvc down pipe and converter housing. I need new drain pipes installed for a bath and a sink. I have the pvc pipe for this with pvc cement. I need copper pipe routed to new sink location. Old copper pipe closed off. I have the majority of the materials already purchased and ready to go for the job. The bathroom is completely guttered and has good access. I would like the job to be completed after the 4th of January 2023.
#1 | Tradie 1 |
|
18 jobs | No longer in contact |
Partner with Builderscrack
Get work