1/ move kitchen waste approx 500mm to new location (all underfloor). 2/ Move hot/cold supply similar distance. Currently copper but addition can be plastic. 3/ Cap off a oven gas supply as no longer required. 4/ cut off old gas heater as no longer required.
Partner with Builderscrack
Get work