Needing to be done by 1 October. Need replacement of old sink with new sink, taps, waste disposal unit installed into kitchen. Old toilet replaced with new toilet. Fridge plumbed into mains.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 07-10-2021
Partner with Builderscrack
Get work