Review

PVC downpipe upgrade

Job image

Job description

Storm water
North Shore

In order to start our insurance managed claim for flood damage downstairs, we have been asked to make the following changes to this under-deck drainage: - Increase the size of the downpipe to handle heavy rainfall - Redirect pipe to drain as pictured (currently appears to head towards and seep into the backyard) The distance from the gutter connection to the drain is approx 1500mm and I believe the existing downpipe is 35mm. We will likely need additional more comprehensive drainage work done but will wait until after insurance has completed their end, so we're not incurring any additional unnecessary costs. Cheers


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Great communication and Nick did a perfect job, was a lot faster than I expected to complete the work, and Nick also gave great advice on some other work which I could DIY. Not the cheapest but we’re happy with the quality result.

Work carried out by an employee of the company
Reviewed on 25-03-2024

Tradesperson reply
"Thank you so much for taking the time to leave us a review!"

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo