We need a toilet, vanity and washtub dis-connected and removed so the floor can be repaired. Once the new flooring is down, need these 3 items put back and re-connected. Disconnection/removal needs to be Monday 7th November first thing in the morning, all going well toilet/vanity/washtub could be reconnected on Thurs 10th or Fri 11th Nov
#1 | Tradie 1 |
|
112 jobs | No longer in contact |
Partner with Builderscrack
Get work