Review

bath / shower alteration

Job description

Renovation & Repair
Napier

Relocating the shower head and valve assembly to the opposite end of the bath. the plumber will need to relocate the plumbing along a wall and fit up the new plumbing to either another (supplied) shower assembly OR use the existing one. The old bath will be removed and another one (supplied) installed in its place. Due to the nature of the concrete floor i will not be rotating the bath. just leaving it the same way.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo