I have a garage from house purchase that turns out, has not got compliance yet (built by skyline 2 years ago but not signed off) and the spouting downpipes simply go to ground. I'd need a 1.8m concrete pipe (vertical) soakaway dug and built and inspected by Building control and then downpipe connect to the downpipes and spoil removed.
#1 | Tradie 1 | No recent reviews | 3 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work