to be completed by the end of May or early June 2019. Kitchen sink will also need to be moved. The layout of the bathroom will remain the same but a new suite needs to be installed. Also new fittings required for the laundry room.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Steve (Majestic Plumbing) is brilliant.
Work carried out by the owner/operator
Reviewed on 05-07-2019
Partner with Builderscrack
Get work