Hi, Please check photos ; 6 fixtures and a gas hob. Upstairs kitchen is all new. Downstairs refer to photos for drainage. Please note that there is work for both upstairs and downstairs. Drainage installed only for the bottom. It will be necessary to preinstall pipes and charge system for the Council to check. Finalize the work only after their inspection.
#1 | Tradie 1 |
|
31 jobs | In contact |
#2 | Tradie 2 |
|
8 jobs | No longer in contact |
#3 | Tradie 3 |
|
243 jobs | No longer in contact |
#4 | Tradie 4 |
|
2 jobs | No longer in contact |
#5 | Tradie 5 |
|
3 jobs | No longer in contact |
Partner with Builderscrack
Get work