We are replacing an outside toilet and shower with new prefab so need to do new connections for them once prefab is built. Toilet. Shower basin. Elec water heater. Bonus if you can install shower cubicle which is just a cnr unit with tray. Waste existing and water connected just needs to be connected to everything. Approx 3 weeks install needed.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
5.0
|
Great comms and workmanship. Helped us alot to figure out the best way to do the job we needed doing and saved us more expense. Would recommend.
Work carried out by the owner/operator
Reviewed on 08-05-2022
Partner with Builderscrack
Get work