The installation of bulldozer pumps as well as connections for suction pipe and laying pipe up to tank for farm water. Approx 500 meters of pipe to lay, use of tractor with pipe plough available.
#1 | Tradie 1 |
|
12 jobs | No longer in contact |
#2 | Tradie 2 |
|
21 jobs | No longer in contact |
#3 | Tradie 3 |
|
138 jobs | No longer in contact |
#4 | Tradie 4 |
|
5 jobs | No longer in contact |
Partner with Builderscrack
Get work