I need an old shower taken out and a new shower installed. I haven't bought the shower yet but one I am thinking of buying will require modifications to the waste from centre to corner. Tiles will need to be cut but can be done quickly as new flooring going in. Job needs to be completed within 2 weeks. Flooring booked for early March.
#1 | Tradie 1 |
|
75 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 11 jobs | No longer in contact |
#3 | Tradie 3 |
|
286 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 0 jobs | No longer in contact |
#5 | Tradie 5 |
|
120 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 76 jobs | No longer in contact |
#7 | Tradie 7 |
|
152 jobs | No longer in contact |
Partner with Builderscrack
Get work