Review date: 15-06-2022
Block Wall Maintenance
New Drainlaying
Fairfield, Hutt Valley
4.0
The underground portion of an external block wall (that is set into a slope) was dug up, new waterproofing installed, then refilled.
After 12 moths, the room inside has dried out and stayed dry, there are no more musty smells.
Work was done within the schedule, in spite of the weather, and communications were good.