We're renovating our separate toilet room over summer, which will include removing the existing toilet and replacing with a Caroma Urbane Wall Hung Invisi Series II® Toilet Suite. We also want to add a wall-hung basin with wall-mounted mixer and spout. We'll be doing all the renovation work (have previously done similar in the main bathroom) but need help with all the plumbing aspects of this job - i.e. water and waste disconnections and connections. IMPORTANT: We're looking for someone who'll be available to work over the period 27 December 2023 - 6 January 2024. Most components have been pre-purchased - refer to photos. We will rely on you to supply suitable basin waste and trap.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Really easy to work with. Straight up comms and sticks to schedule. Great outcome for our bathroom renovation - thanks Drew!
Work carried out by the owner/operator
Reviewed on 28-01-2024