We are laying new engineered floor boards in our toilet area and the existing (7 year old), toilet needs to be lifted up for this to happen. The laying of the floor will take half a day. As we only have one toilet, I would need this job to be coordinated with the same day the floor laying is taking place.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Chad sorted out timings of work to fit in with another tradie. He did a good job and was pleasant to deal with.
Work carried out by the owner/operator
Reviewed on 20-02-2020