Need a trench dug approx 2m long in order for drain pipe. Maybe an hour or two with a small excavator. Some concrete sections to be broken up. Drain to be laid and we can do the rest ( backfilling etc). So no more than a day of work at most.
#1 | Tradie 1 |
|
1 job | No longer in contact |
#2 | Tradie 2 |
|
35 jobs | No longer in contact |
#3 | Tradie 3 |
|
36 jobs | No longer in contact |
Partner with Builderscrack
Get work