Shifting a laundry through the wall to the garage. Installing a bathroom into the old laundry. Putting in 2 new toilets.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
3.0
|
Communications |
5.0
|
Unfortunately Christmas, New Years and asbestos in the old Lino caused the job to take longer than anticipated. But I am thrilled with the final result.
Work carried out by the owner/operator
Reviewed on 03-02-2018
Partner with Builderscrack
Get work