To make way for building works i require changes to some of my plumbing. It is a 1960's house with mainly copper piping. All is underfloor work with excellent standing access. 1) relocate the main cold line after it enters the house, can change from copper to buteline or similar. 2) new branches from the relocated main line to existing bathrooms (hot and cold). 3) Reroute 1x toilet and 1x sink drain
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 30-05-2017
Tradesperson reply
"Cheers"
Partner with Builderscrack
Get work