Remove wall between toilet and bathroom. Block up door. Remove all current sanitary ware (toilet, bath, shower cubicle, basin). Install shower cubicle, toilet and basin supplied by us. Install new light/heater/extractor unit. Remove wal tiles and flooring. Finish walls,ceiling and floor ready for decorating.
#1 | Tradie 1 | No recent reviews | 13 jobs | No longer in contact |
#2 | Tradie 2 |
|
72 jobs | No longer in contact |
#3 | Tradie 3 |
|
75 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 8 jobs | No longer in contact |
#5 | Tradie 5 |
|
559 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work