Hi, I need a connection to an existing sewer, then a run of 6 meters and a 90 degree turn and then another 18 meters of sewage pipe layed, to end at a new gulley trap, and an existing toilet (that already has a vent). I need a quote for labour and materials please. And please also include whether this would include you digging the ditch, if not I can arrange separately. thanks
Partner with Builderscrack
Get work