1. Main water tap stack open (pic 1). Make it work for long run by replacement internal parts or install other in under floor area (pic 2) on PVC pipe (right bottom corner). For jobs 2 & 3 replace PVC & coper pipes with new grey (Polybutene?) pipes with all connection done under floor area (not in wall cavity). 2.Kitchen taps convert to mixer connection (pic 2&3). Garden tap supplied from kitchen pipe (pic 4). Cut old pipe and leave it. Install new garden tap under floor level next to waste pipe (pic 2). 3.Laundry taps convert to mixer connection. Cut and leave pipes to washing machine taps (pic 5,6&7).
Partner with Builderscrack
Get work