We require two additional outdoor taps mounted on the exterior cladding. Majority of the plumbing is original galv pipes underfloor. Underfloor access is good.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 20-11-2023
Partner with Builderscrack
Get work