Active job

Trenching and reinstating

Job description

Drainlaying
Christchurch

To trench and reinstate for underground cable installation. Requirements: 1. 700mm deep with 75mm thick layer of smooth clean river sand surrounding cables 2. Trench to be back filled, consolidated and surface restored to its condition prior to trenching. 3. Midway through backfilling lay a plastic warning strip. 4. Trenches across roads or paved areas shall be backfilled with crushed gravel not excavated material.


Trade professionals

#1 Tradie 1 Not reviewed 0 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo