Closed job

Bathroom renovation - plumbing

Job image
Job image
Job image
Job image
Job image

Job description

Renovation & Repair
Christchurch

Pre gib and tile plumbing required then fitting of all bathroom hardware Listed below . All Tapware, toilet , shower head , shower rail with head, shower diverter mixer ,Bath spout , bath mixer , basin tap mixer has been bought *Toilet pre plumbing then Install toilet + update tap/hose etc to toilet - toilet position is same as existing *Bath Pre plumbing - relocate Hot&cold feeds for bath mixer From front to side of bath , install bath spout and install mixer once tiling is finished *Shower - install pre plumbing (shower plumbing in similar position ) for shower including rain head , seperate shower slider Rail Shower + shower diverter mixer .then install once tiling is finished *Basin - pre tile plumbing , slightly relocate hot and cold feed so it is located to enter up into the basin through the vanity and connect to basin mixer tap Bathroom will have been stripped of gib and opened up for plumbing , there is easy access under the floor with lots of room to get around Timeframe - pre tile plumbing in the next Two weeks , final plumbing installation two weeks after pre tile plumbing has been fitted .


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo