Remove temporary electric pump. Re-design and replace 7m section of (now bypassed) sewer pipe, partly under tiled concrete deck, closely adjacent to house. Job is needed because of earlier, inadequate earthquake repairs.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
4.0
|
Work still in progress. We are very satisfied with the trades-person. Have almost finished planning the job and hope to start the job itself very shortly.
Work carried out by the owner/operator
Reviewed on 02-02-2020