Urgent job, preferably this weekend. Stage One Capping off of existing plumbing for shower and vanity and revamp of 70's toilet plumbing for current style back to wall toilet ( involves 90* rotation of toilet). My son a builder will do physical removal of units etc and then will install a new floor prior to the installation undertile heating and tiles. If interested there will then be Stage Two, Installation of new vanity/shower box/toilet and then Stage Three similar work for ensuite bathroom.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent job, no issues, thankyou.
Work carried out by the owner/operator
Reviewed on 28-08-2019