I’m looking for a plumber / drainlayer to come round and provide advice & a quote to do all plumbing work for a new bathroom in an old villa. The work will include: • Supply & installation of new waste water pipe for new toilet, shower & basin. • Connection of new waste water pipe to existing sump or pipe including any necessary vents • Supply & installation of hot / cold water supply pipes to be connected to existing pipes under floor At this stage we plan to purchase the bath, toilet, sink, taps etc separately and will be looking to have them installed. We have just started the basic prep of the space, timber framing for the new wall will be installed in the next 3-4 weeks and plumbing work can commence after that. We are relatively flexible on timing of the actual work but would like a plan & quote before 20/2/16 please.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 23-05-2016
#1 | Tradie 1 | No recent reviews | 51 jobs | Secured job |
#2 | Tradie 2 |
|
5 jobs | No longer in contact |
#3 | Tradie 3 |
|
57 jobs | No longer in contact |
Partner with Builderscrack
Get work