I am having a new log burner installed and need to have my very old HWC replaced with wetback. I have approval from EQC for this work but need a quote that assures "like for like" replacement (capacity) as well as a note stating that the existing HWC will not handle a new log burner (I have already been told this by a registered master builder). I need this done before winter as part of the EECA priority scheme.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
4.0
|
Paul Jackson plumbing eventually did this work. The quality was good and given how busy they are with the earthquake the communication was goo too. Thanks Paul. Regards
Work carried out by a subcontractor
Reviewed on 27-04-2011
Partner with Builderscrack
Get work