My wife and I are planning to renovate our en suite bathroom. We need a plumber to block off the current piping and drainage to our vanity unit and shower, as well as remove an in-built cistern and wall hung toilet, and move the current toilet sewer outlet pipe in the wall, 155mm laterally to accommodate a new BTW toilet. We would like the work to be take place on or around 20th February, 2023, if possible. Attached images show the pipework to be blocked off under the vanity, the shower fittings to be blocked off, and the wall hung toilet with built-in wall cistern to be blocked off and removed, and piping relocated in wall.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Irshaad was a pleasure to work with. He completed our job very efficiently and to a high standard. He was very polite and with excellent communication skills. He accommodated our wishes cheerfully and effectively. I would highly recommend him to others.
Work carried out by the owner/operator
Reviewed on 07-04-2023
#1 | Tradie 1 |
|
5 jobs | Secured job |
#2 | Tradie 2 |
|
20 jobs | No longer in contact |
#3 | Tradie 3 |
|
141 jobs | No longer in contact |
#4 | Tradie 4 |
|
50 jobs | No longer in contact |
#5 | Tradie 5 |
|
58 jobs | No longer in contact |
Partner with Builderscrack
Get work