Review

Simple Waste water Connection

Job description

Renovation & Repair
Auckland

Connect into the waste, which runs 1m underground at the back of our property,. It's covered by a small layer of Gap20, and then mostly earth. We need to connect into it and run a pipe 3 meters into a shed and then leave it under the floor capped for possible future use. That is all. Dig down to the waste, run 1 short length of pipe, and connecting into the waste.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo